New Energy Grid Connected Detection

Application scenarios

Electricity demand forecast

If the goal of carbon neutrality is to be achieved in 2060, China's electricity demand will more than triple, and it is expected to exceed 20 trillion kwh. If calculated according to the annual power generation hours of 2000 hours, there will be about 10 billion kilowatts of new energy installed capacity.

Carbon neutral by 2060

At the general debate of the 75th UN General Assembly, China made it clear that it should adopt more favorable policies and measures, strive to reach the peak of carbon dioxide emissions by 2030, and strive to achieve carbon neutrality by 2060.

New energy development

Driven by the background, new energy power stations have sprung up to benefit human beings, protect the environment and reduce carbon emissions. However, equipment performance, construction technology, power quality and islanding response in grid connection acceptance have also become the key problems of power station operation.


Service Items

Grid connected acceptance test of photovoltaic power station
新能源并网检测(图1)
Consistency check of power station (project basic documents, power station equipment contract documents)
Continuity detection of grounding system
PV module / array layout and installation quality
Appearance quality and installation effect inspection of grid connected inverter
Infrared thermal imaging test of photovoltaic module
El test of PV module
Inverter efficiency detection
System efficiency test
Power quality test
Anti islanding response time test
Client needs customization
Acceptance test of energy storage equipment
新能源并网检测(图2)
Consistency check of power station (project basic documents, power station equipment contract documents)
Power quality inspection
Inverter efficiency detection
Islanding response time test
Charge discharge response time test
Rated energy test
Rated power energy conversion efficiency test
Client needs customization
Acceptance test of new energy vehicle charging station
新能源并网检测(图3)
Equipment consistency check
Voltage deviation detection
Frequency deviation detection
Harmonic voltage and current detection
Three phase unbalance detection
Measurement system check


According to the standard

GB/T 12325-2008《电能质量 供电电压偏差》
GB/T 15945-2008《电能质量 电力系统频率偏差》
GB/T 15543-2008《电能质量 三相电压不平衡度》
GB/T 14549-1993《电能质量 公用电网谐波》
GB/T 24337-2009《电能质量 公用电网间谐波》
GB/T 50796-2012《光伏发电工程验收规范》
NB/T 32004-2018《光伏并网逆变器技术规范》
NB/T 32006-2013《光伏发电站电能质量加测技术规程》
CNCA/CTS 0022-2014《光伏发电系统评估技术要求》
CNCA/CTS 0004-2010《并网光伏发电系统工程验收基本要求》
CNCA/CTS 0016-2015《并网光伏电站性能检测与质量评估技术规范》
JGJ/T264-2012《光伏建筑一体化系统运行于维护规范》
JGJ 203-2010《民用建筑太阳能光伏系统应用技术规范》
GB/T 36547-2018《电化学储能系统接入电网技术规定》
GB/T 36548-2018《电化学储能系统接入电网测试规定》
GB/T 36276-2018《电力储能用锂离子电池》
NB/T 33014-2014《电化学储能系统接入配电网运行控制规范》
NB/T 33015-2014《电化学储能系统接入配电网技术规范》
GB/T 31464《电网运行准则》
GB 50303-2015《建筑电气工程施工质量验收规范》
GB 50054-2011《低压配电设计规范》
GB 50055-2011《通用用电设备配电设计规范》
GB 50311-2007《综合布线系统工程设计规范》
GB 50254-2014《电气装置安装工程低压电器施工及验收规范》
GB 50150-2016《电气装置安装工程电气设备交接试验标准》
GB 4706.1-2005《家用和类似用途电器的安全通用要求》
DGJ 08-100-2003《上海市低压用户电气装置规程》
沪安委办[2017]20号《市安委会办公室关于印发上海市开展电气火灾综合治理工作实施方案的通知》
沪卫计财务[2017]74号《关于做好电气火灾综合治理工作的通知》


Case

Inspection acceptance
新能源并网检测(图1)

Acceptance case of poverty alleviation photovoltaic power station grid connection

Acceptance test:

In this test project, 10 village level power stations were selected, 53 photovoltaic series insulation resistance performance, 57 photovoltaic panel grounding continuity, 157 photovoltaic panel appearance inspection and infrared scanning were tested, 10 photovoltaic panels were selected for El test, 12 grid connected inverters were selected to test the power quality of their output end and 0.4kV grid connection point, and 11 grid connected inverters were selected to test their conversion efficiency .

Test content:

新能源并网检测(图2)
新能源并网检测(图3)

Customer value:

The test results show that the main problems are hot spots and shadow cracks;
Part of the site water does not meet the relevant national standards.
The daily power generation and irradiance of photovoltaic power station are counted, and the generation efficiency is calculated to provide customers with reference. It points out the direction for the customers to carry out the project rectification, and also has the bottom in mind for the future power station income.

Inspection acceptance
新能源并网检测(图4)

Power quality test of charging station access

Test background:

According to the operation and acceptance requirements of new energy vehicle charging station, the power quality test is carried out to detect whether there are power quality problems in each parallel network under the trial operation state.

Test content:

Recover the accident capacitor and detect the power quality of the access point of the compensation capacitor,The operation condition of the capacitor is tested by group switching mode, and the capacitor samples are sent for test.

新能源并网检测(图5)
新能源并网检测(图6)

Customer value:

According to the field test data evaluation, the power quality test data (frequency, total harmonic voltage distortion rate, 2-25th harmonic voltage distortion rate, voltage three-phase imbalance) of 0.4kV incoming line of charging station meet the requirements of national standard.